Sub-bases
The realisation of the underlying surfaces for the laying of the
pavement has a major role in the execution of the work. The under-surface
is to be realised following the below scheme, without forgetting
that it is necessary to leave a thickness of 3\4 cm in addition
to the one of the pavement to be laid (for example: for a pavement
6 cm thick it is necessary to leave 9/10 cm from the level of the
finished base).
For the laying of slabs and cubes puttied in white lead cement,
it is necessary to realise a under-surface in concrete with an electrowelded
wire netting.
Our company carries out all the steps in the preparation of the
underlying surface in the event of necessary integrative works,
such as waste water collection through wells and pipes, repairing
sewer portions, arrangements of future connections, etc
We suggest that our Customers who require outside pavements should
keep into consideration also the possible changes that they might
be willing to make through the years, so as to arrange them without
having to modify the floor.