Home Floors and marbles tiles Facings and walls Sub-bases Gallery Map Info

Sub-bases
The realisation of the underlying surfaces for the laying of the pavement has a major role in the execution of the work. The under-surface is to be realised following the below scheme, without forgetting that it is necessary to leave a thickness of 3\4 cm in addition to the one of the pavement to be laid (for example: for a pavement 6 cm thick it is necessary to leave 9/10 cm from the level of the finished base).
For the laying of slabs and cubes puttied in white lead cement, it is necessary to realise a under-surface in concrete with an electrowelded wire netting.
Our company carries out all the steps in the preparation of the underlying surface in the event of necessary integrative works, such as waste water collection through wells and pipes, repairing sewer portions, arrangements of future connections, etc…
We suggest that our Customers who require outside pavements should keep into consideration also the possible changes that they might be willing to make through the years, so as to arrange them without having to modify the floor.

   
MONDIAL PIETRE
Via Benevagienna, 15 - 12061 CARRU' (CN)
Tel. 0173/759222 - Fax. 0173/759849 - info@mondialpietre.com